Wind energyServices
Installation and commissioning
From the WINDER archive. The specifications, tariffs, connection rules and statistics in this article may have changed since publication.
Since 2005, WINDER has launched more than 200 wind turbines or solar panels. We will be happy to help you.
Wind turbine installation has three main stages.
- Excavation, pouring the foundation and laying the cable
- Assembling the tower and turbine head, then mounting the turbine on the foundation
- Connecting the controller, inverter and batteries, setting up the system and commissioning it
The following paragraphs describe each stage.
Excavation, pouring the foundation and laying the cable
The foundation is excavated and the formwork erected to the drawings. The reinforcing cage is installed and the foundation poured with high-grade concrete. The entire pour takes place in one day. The foundation reaches full strength after 25 days.
The turbine power cable runs in an underground duct at a depth of at least 30 cm and enters a dedicated inverter room.
Assembling the tower and turbine head, then mounting the turbine on the foundation
The turbine should be erected on a calm day. A tower supplied in sections is assembled according to the drawings. The cable runs inside the tower, and the turbine head, comprising the generator and blades, is bolted to the top flange.
The lower tower flange sits on the foundation and is secured with nuts on the anchor studs. Until the generator is connected to its controller, its power cable must remain short-circuited, with the phases connected together.
Connecting the controller, inverter and batteries, setting up the system and commissioning it
The generator’s three-phase output connects to the corresponding controller inputs. The batteries must be connected in series as a bank. Connect the red battery lead to the positive terminals on the controller and inverter, followed by the black lead to the negative terminals.
The controller and inverter are initially configured according to their technical manuals. A test run confirms the turbine is operating correctly.
Although the sequence sounds simple, installation involves many practical details. WINDER recommends professional installation for turbines rated at 5 kW or above.