About us
WINDER is an engineering company based at 35 Svitlytskoho Street in Kyiv. We started in 2005–2006 with our own wind turbine brand and Ukrainian-made towers. Today we design and build solar installations and energy storage systems for homes and businesses.
Recent history, 2019–2026 (as of November 2026)
From 2019 to 2026, WINDER focused on designing, supplying and installing solar and hybrid power systems in Ukraine.
- Solar installations for businesses — rooftop and ground-mounted PV for on-site consumption with zero export, net billing for active consumers and industrial energy storage systems (ESS).
- Residential energy solutions — backup power during outages, hybrid solar systems with LiFePO4 batteries and off-grid solar installations.
- Equipment catalogue — selection and supply of solar panels, grid-tied and hybrid inverters, battery storage, mounting systems and components.
- Completed projects — the public portfolio includes 110 verified installations with photographs and equipment lists. These include rooftop and ground-mounted PV plants built in 2019–2020 across the Kyiv, Kharkiv, Dnipropetrovsk, Odesa, Rivne, Sumy, Poltava, Cherkasy, Kirovohrad and Kherson regions, as well as wind and hybrid systems.
Company archive, 2005–2018
From the WINDER archive. The specifications, tariffs, connection rules and statistics in this article may have changed since publication. The following timeline preserves the company’s 2005–2018 history from its previous website.
2018
We began supplying SolarEdge grid-tied inverters. They are designed to work with power optimisers at sites where some panels may be shaded.
WINDER signed an exclusive representation agreement with China Sunergy, whose CSUN solar panels featured for many years on Bloomberg’s Tier 1 manufacturer list.
We moved to an office at 35 Svitlytskoho Street in Kyiv.
2017
Growing demand for grid-connected solar led us to import equipment directly from KACO new energy GmbH and Kostal in Germany. The most popular models were KACO’s 15 kW blueplanet 15.0TL3 and Kostal’s 3 kW PIKO 3.0 grid-tied inverters.
We started working with Home Energy and took delivery of its first spherical wind turbines, the Energy Ball 100 (550 W) and Energy Ball 200 (2.5 kW). Both models were made in the Netherlands and featured a distinctive design.
2016
For years, homes in gardening associations and cooperatives could not access the feed-in tariff because their electricity contracts were indirect. A three-party agreement enabled Ukraine’s first such connection, establishing an agreed legal procedure for residential solar installations in cooperatives.

At the end of the year, the company organised a New Year holiday in Egypt for its staff.
The commercial PV plant in Sinhury was among the first in the Zhytomyr region to qualify for a business feed-in tariff.
2015
Our staff visited one of Germany’s largest wind farms to see industrial Enercon E126 turbines, each rated at 7.5 MW.
Despite the overall decline in Ukrainian exports, WINDER reached new markets for wind turbine components. In September 2015, we prepared drawings, manufactured prototypes and erected towers for Estonian turbine maker TUGE.
We added Amerisolar PV panels and BOSCH grid-tied inverters to our solar range. Our wind monitoring equipment range also gained the Skywatch weather station from Swiss manufacturer JDC ELECTRONIC SA.
In 2015, we also published wind and solar energy reviews and project updates on Google+. The service operated until April 2019.
WINDER marked its tenth anniversary on 4 April 2015.
2014
The Micon M530, made by Denmark’s NEG Micon, joined our portfolio. This 250 kW turbine has a 30 m tower. The 2014–2015 project covered the initial assessment, dismantling, transport and refurbishment, followed by installation in Armenia.

With increasing pressure to improve pricing on imported solar panels, our management visited several solar panel and battery factories to inspect production before expanding the range.

After the inspections in early 2015, we introduced panels from new manufacturers for large projects and corporate customers.
The residential feed-in tariff was a major development in Ukrainian renewable energy in 2014. Resolution No. 170 encouraged grid-connected solar installations. That year we supplied and installed equipment for several projects and helped customers complete the paperwork to connect under the tariff.
2013
WINDER launched its online shop at winderukraine.com, offering wind turbines, solar panels and related equipment.
WINDER managers attended a renewable energy and energy efficiency exhibition in South Korea.

Our work with DTEK continued. At Wind Power’s request, we installed a 1.2 kW Winder T12 turbine at Kyiv’s International Exhibition Centre ahead of the Energy 2013 exhibition.
We completed a project to manufacture and supply wind turbine blades in Armenia.
We worked with SMA, Schott Solar, Bosch and Fortis Wind Energy to supply power system equipment for commercial sites in Ukraine.
We held a series of talks with the French investment company Agence Internationale d’Investissements & de Développement about financing solar projects under the feed-in tariff.
2012
In 2012, we launched company pages on Facebook and LinkedIn to share news and articles on wind and solar energy.

We signed an agreement with Fairwind to distribute vertical-axis wind turbines in CIS countries.
We expanded our range with turbines from Quietrevolution in the UK and Fairwind in Belgium.

We completed the tower design for Belgian manufacturer Fairwind’s 40 kW vertical-axis wind turbines.
2011

Several dozen wind turbines rated at up to 12 kW were installed from the beginning of the year.
We upgraded equipment at several sites. As their energy needs grew, existing customers added solar panels, ordered higher-capacity inverters and purchased additional batteries.
We launched the English-language website winderblades.com.
We redesigned the main winder.ua website for our customers and partners.
2010
The number of WINDER-branded turbines installed in Ukraine, Latvia and Estonia passed 100.
We began working with Dutch manufacturer Fortis, known for its exceptionally quiet wind turbines. Our first 5 kW, 240 V Fortis Montana was installed at the Rosynka cooperative in Stari Bezradychi, Kyiv region, together with ten 185 W Kvazar PV panels.
We began working with Dutch Rainmaker B.V., which developed a system for condensing water from air using a stand-alone 100 kW wind turbine. In 2011 we delivered the first components, including towers, anchors, platforms, equipment mountings and blades.

We established small-batch production of inverters rated from 10 to 50 kVA.
Our office and warehouse moved to a dedicated three-storey building in Sofiivska Borshchahivka.
We held talks in Kyiv with companies from Spain and Korea.
2009
Work began on Vetroportal, a wind energy news and information website designed by the Ukrainian studio Zyma Media.
Together with VEL, we manufactured our first 30 and 50 kVA three-phase inverters for sites in Kozyn and Pyliava, Kyiv region.

We delivered our second annual report to the Council of Ministers of Crimea on the state of the Ukrainian small wind market.
We held talks with British turbine manufacturer Proven Energy.
We installed a record number of wind turbines during the year, with a combined capacity of 150 kW.
Executive Director Ivan Sydorenko was interviewed on Inter TV’s evening news.
We discussed working with WindElectric to develop the manufacture of small wind turbines in Ukraine.

Company management met Ukrainian President Viktor Yushchenko and conducted an energy audit at an estate in Bezradychi to assess its suitability for a wind turbine.
Executive Director Ivan Sydorenko and Head of Sales Oleksii Krupena were interviewed on ICTV.
We decided to refocus the business on exporting wind turbines and components.
2008
We established an international relations department led by Dariia Linkova.
We held talks with companies in Latvia, Estonia and Georgia and signed several agreements to establish the WINDER dealer network.
We stopped importing turbine towers and established the Winder Tower division to manufacture them for our Ukrainian projects and for export.

Maksym Urbanskyi became the company’s technical director.
We began working closely with Tsetus LLC, an installation company in Cherkasy.
As the company expanded, 16 employees moved to a new office at 34 Biloruska Street.
Executive Director Ivan Sydorenko presented a report on the development of small wind turbines in Ukraine to the Council of Ministers of Crimea.
WINDER executives Ivan Sydorenko and Maksym Urbanskyi took part in the EWEC wind energy conference and exhibition in Brussels.

WINDER engineer Oleh Chernousko spoke at the awards ceremony for the national Top Energy Efficiency 2008 competition.
The head of the company travelled to China for talks with new manufacturers.

WINDER received its trademark registration certificate and moved the website to the new winder.ua domain.
Together with VEL and Bestpower, we developed a new automatic transfer switch cabinet.
2007
Company founders Ivan Serhiiovych Sydorenko and Olesia Mykhailivna Sydorenko visited several turbine factories and met with SWG (Yangzhou Shenzhou Wind Driven Generators Co Ltd), then China’s largest wind turbine manufacturer.

The first container of SWG turbines branded WINDER arrived.

Ukraine’s first 10 kW and 20 kW units were installed in Petrivske, Kyiv region, and Mariupol respectively.
We substantially updated winder.com.ua.
Work began on Winder Tower, a project to manufacture wind turbine towers for export.

Oleksii Meretskyi became the company’s commercial director.
We launched the Winder Solar division, led by independent entrepreneur Oleksandr Tuhai.
Our team grew to 12 and moved to new premises at 14 Solomianska Street.
We established a dealer relations department led by Illia Ostroshapskyi.
2006
We imported the first five Mallard wind turbines from the United States. Tests showed that the units did not perform adequately and were unsuitable for Ukrainian conditions.
We decided to develop our own brand independently of Western manufacturers.

We designed the WINDER logo and filed for trademark registration on 20 October 2006.
We launched winder.com.ua and moved the website to winder.ua once the trademark was registered.
We began talks with several Chinese factories about manufacturing WINDER-branded turbines under OEM agreements.

2005
The decision to start the company was made on 28 February 2005. Astra-Sneks LLC was founded on 4 April 2005.
We held talks with US manufacturer Mallard about purchasing 800 W wind turbines.