Completed projects
During the time of the existence of our company, we have already installed more than 180 wind turbines with capacity from 300 W to 20 kW.
The total capacity of installed machines is over 400 kW. This is the best result among the companies involved in small wind energy in Ukraine.
In this section we would like to introduce you some of our facilities.
1.
2014, Finland
What has been done: in the course of the project carried out the initial assessment of the state of the generator in operation at the site of the original installation – Kauhava city, Finland. Dismantled, loading, transportation is carried out. Installation is scheduled for spring 2015.
Wind turbine: Micon M530 (250 kW), the manufacturer NEG Micon, Denmark, mast 30m of the four segments.
2.
2014, Kirovograd region.
What has been done: installed components and carried out the network system of 10 kW for private house to connect on a green tariff.
Equipment: Solar Panels Sunrise Solartech 245Vt (40 pcs.), Network 5kW inverter SMA Sunny Boy 5000TL (2 pieces).
3.
2014, Vishenki vil., Kiev region.
What has been done: installed the equipment for the network system with the possibility of a stand-alone switch for a private house.
Equipment: Solar Panels Sunrise Solartech 245Vt (40 pcs.), 5 kW AC inverter SMA Sunny Boy 5000TL (2 pcs.), Autonomous 6 kW inverter Sunny Island 6.0H, the control panel Sunny Home Manager, SMA Sunny Remote Control and AGM batteries 200Ach / 12V (24 pcs.).
4.
2014, Pobedy ave., Kiev
What has been done: installed components and produced installation of network system of 20 kW on the roof of the hotel to connect on the green tariff.
Equipment: Solar Panels Sunrise Solartech 245Vt (80 pcs.), network inverter of 10 kW Power-one Aurora PVI-10.0 (2 pcs.).
5.
2013, International Exhibition Center, Kiev
What has been done: in the course of the exhibition "Energy 2013" commissioned by Wind Power in the International Exhibition Centre in Kiev installed wind turbine Winder T12 (1,2 kW).
Wind turbine: WINDER T12 (1.2 kW, 48V), the mast 9 meters with advertising design, foundation block.
6.
2013, Moscow region
What has been done: installed 6 photovoltaic panels Sunrise Solartech 235W for backup power supply system for a private house.
7.
2013, Kuznetsovsk, Rivne region
What has been done: the delivery of equipment and commissioning of the combined wind turbine system Fortis Montana 5kW (Netherlands) and 12 photovoltaic panels ET Solar 250W.
8.
2012, Kyiv region
What has been done: set components for autonomous power supply camper. Were used solar panels 235Vt Schott Solar, solar cells 10A charge controller, inverter (500W, 24V) and 2 AGM batteries 200Ach /12V.
9.
2012, Livadia Palace, Crimea
What has been done: Winder T12 wind turbine and solar panels Schott Solar installed during the autumn summit in Yalta. Wind installations were the part of DTEK strand.
10.
2011, Mlynok Farm, Kyiv region
What has been done: Replace the Inverter Merton 5kVA of Chinese production at Ukrainian inverter WINDER WEL (30 kVA, three-phase, 240V), developed and manufactured by our partners, the company VEL. Installed new AGM batteries Emerson 200Ah/6V (40pcs.)
Wind turbine: WINDER W8 (10 kW / 240), established in 2007, mast 12m.
11.
2011, Soltanovka vil., Kyiv region
What has been done: installed the wind turbine WINDER T23 (2.3 kW / 48V) with solid support 11.5m. Installed and connected two inverters Agate 3500, two stabilizers Volter, 4 battery 200Ah /12V.
12.
2011 Pryingulsky Park Nature Reserve, Mykolaiv region/p>
What has been done: installed of 5 solar panels (photovoltaic cells) Quasar 185Vt, connected 10 AGM batteries Ventura 100Ah /12V. Fully self-contained object powered by renewable energy sources.
Wind turbine: WINDER W4 (2 kW, 120 V), set in 2008, the mast 9 meters.
13.
2011 Chygyryn, Cherkasy region
What has been done: installed two wind turbines WINDER T120 (12 kW, 240 V), 10 solar panels Quasar 185Vt, three inverters 10 to 30 kVA WINDER WEL of Ukrainian production.
14.
2011, Hlepcha vil., Kyiv region
Preparation for the installation of 30 solar panels Schott Solar (Germany) 235Vt, manufacturing on order two controllers MPPT.
Wind turbine: WINDER W10 (20 kW / 360V), established in 2008, support 18m.
15.
2010, Pereviz vil., Kyiv region
What has been done: installed the wind turbine WINDER T12 (1.2 kW, 48V), the inverter WINDER X5, batteries AGM Delta 200Ah / 12V, tapered octagonal mast10m. Stand-alone object operated only from renewable energy sources.
16.
2010, Mikhailovka-Rubezhovka vil., Kyiv region
What has been done: installed the wind turbine WINDER W4 (2 kW, 120 V), the inverter BSE 2kVA, batteries AGM Ventura 200Ah / 12V, 10m step mast.
17.
2010 DK Rosynka , Starye Bezradychi vil., Kyiv region
What has been done: installed the wind turbine FORTIS Montana (5 kW, 240V) Batteries Westa 200Ah / 12V, solar panels Quasar 185Vt (10pc.)
18.
2009 Koncha-Zaspa, Kyiv region
What has been done: installed the wind turbine WINDER W10 (20 kW, 360V) Inverter Merton 30kVA, the batteries Emerson 6V/200Ah (120sht.), step mast 18m.
19.
2009, Pilyava vil., Kyiv region
What has been done: installed the wind turbine WINDER W10 (20 kW, 360V), the inverter WINDER WEL (50 kVA, three-phase), batteries Sunlight 6V/200Ah (120sht.) Step mast 18m.
20.
2009, Tsirkuny vil., Kharkiv region
What has been done: installed the wind turbine WINDER W8 (10 kW, 240 V), the inverter Sunny 10kVA, the batteries Emerson 200Ah / 6V (40pcs.), Step mast 16m.
21.
2009 Koncha-Zaspa, Kyiv region
What has been done: the replacement of the wind turbine WINDER W4 (2 kW, 120V), established in 2008 by a new model WINDER T60 (6 kW, 48V), mast with spiral staircase 20m. Inverter 2 KVA was replaced to 5 KVA, added batteries Emerson 6V/200Ah. Old wind turbine client transferred to another facility.
22.
2009, Older Bezradychi vil, Kyiv region
What has been done: installed the wind turbine WINDER W6 (5 kW, 240V) Inverter Merton 10kVA, the batteries Delta 100Ah / 12V (20pcs.), mast 12m.
23.
2010, Kiev
What has been done: installed the wind turbine WINDER W4 (2 kW, 120 V), the inverter Fort 3.5 kVA, batteries AGM Delta 200Ah / 12V (10pcs.), mast 9m.
24.
2009, S. Brovary, Kyiv region
What has been done: installed the windmill WINDER W8 (10 kW, 240V) inverter WINDER WEL (50 kVA, 3-phase), batteries, AGM BB 200Ah/12V (40pcs.), mast 18m.
25.
2008, Yasnogorodka vil., Kyiv region
What has been done: installed the wind turbine WINDER W10 (20 kW, 360V), the inverter Sunny 20kVA, the batteries Delta 100Ah/12V (90sht.) Mast 18m.
26.
2008, Mlynok farm, Kyiv region
What has been done: installed the wind turbine WINDER W8 (10 kW, 240 V), the inverter Merton 5kVA, batteries BB 200Ah/12V (20pcs.), mast 12m
27.
2008, Vinnitsa region
What has been done: on the roof of an extension to the training center installed a wind turbine WINDER W4 (2 kW, 120 V), the inverter BSE 2kVA, mast 9m.
28.
2008, Sophiyivka vil., Mykolaiv region
What has been done: installed the wind turbine WINDER W4 (2 kW, 120 V), the inverter BSE 2kVA, mast 9m
29.
2008, Vinnitsa
What has been done: installed the wind turbine WINDER W3 (500W, 24V), the inverter BSE 500VA, batteries AGM Delta 12V/100Ah.
30.
2007, Orenburg, Russian Federation
What has been done: installed the wind turbine WINDER W10 (20 kW, 360V) Inverter Merton 20kVA, 30AKB 12V / 200Ah, mast 18m.
31.
2007, Kryukovshina vil., Kyiv region
What has been done: installed the wind turbine WINDER W3 (500W, 24V), mast 18m.
32.
2007, Petrovskoe vil., the Kiev region
What has been done: installed the wind turbine WINDER W8 (10 kW, 240 V), the inverter Merton 10kVA, 60AKB AGM, mast 12m.